Light Commercial Flatwork We Handle
We're booking light commercial projects now in Clarksville, Nashville, Murfreesboro, Franklin, Springfield and across Middle Tennessee, plus Hopkinsville and Bowling Green, Kentucky.
- Parking lots and drive lanes. New pours, sectional replacement and drainage correction for lots that carry traffic every day.
- Loading pads and equipment slabs. Slabs for delivery trucks, forklifts and equipment staging.
- ADA ramps, curb cuts and accessible routes for retail and office properties.
- Multi-family and sidewalk flatwork. Sidewalks and common-area slabs, poured in phases coordinated with property managers and general contractors.
- Off-hours and weekend pours planned to keep disruption to daily operations down.
Built for Traffic, Trucks and Water
Commercial concrete often fails for the same reasons a home driveway does, under heavier use: a weak base, water with nowhere to go, joints in the wrong place and reinforcement that doesn't match the load.
Every slab starts with site prep, grading and compaction, then a compacted gravel or crushed stone base sized to the soil and the loads. Rebar goes wherever real reinforcement is needed, and drainage is planned so water doesn't pool on the slab.
Loads set the slab. TDOT's standard concrete driveway drawing calls for 6 inches of concrete over at least 4 inches of aggregate base unless plans say otherwise[1], and notes that design may be limited to light commercial traffic. A dock apron that takes loaded trucks all day is a different slab, and it should be bid as one.
Joints and concrete strength
NRMCA recommends control joints no farther apart than 24 to 36 times the slab thickness and no more than 15 feet, with panels close to square[2]. Contraction joints should be cut at least a quarter of the slab depth, and conventional saw cuts made within 4 to 12 hours of finishing[3].
For exterior slabs exposed to moisture, freezing and deicers, NRMCA recommends ordering 4,000 psi concrete[4]. Clarksville sees roughly 70 days a year that go from a freezing night to a thaw[5], and NRMCA says concrete exposed to freeze-thaw should be air-entrained[6]. Ask every bidder what strength and air content they're ordering and how the joints will be laid out.
ADA Ramps, Curb Ramps and Accessible Parking
Accessible routes have numbers the finished concrete has to hit. These come from the 2010 ADA Standards for Accessible Design:
- Ramps. Running slope no steeper than 1:12, about 8.33% (405.2)[7]. Cross slope no steeper than 1:48 (405.3)[8]. No more than 30 inches of rise per run, with level landings at least 60 inches long and at least as wide as the ramp at the top and bottom (405.6, 405.7)[9].
- Walking surfaces. Running slope no steeper than 1:20 and cross slope no steeper than 1:48 (403.3)[8].
- Curb ramps. The same slope limits as ramps, flared sides no steeper than 1:10, and a top landing at least 36 inches long (406)[10].
- Accessible parking. Spaces and their access aisles at the same level, with slopes no steeper than 1:48 (502.4), on surfaces that are stable, firm and slip resistant (302.1)[11].
Get the grade right before the pour
Slope is set at the forms. Once concrete hardens, a ramp that came out too steep usually has to be cut out and poured again, so grades should be checked before the truck arrives, not after. If the issue is an existing sidewalk panel that has sunk, repair and leveling may fix it without a re-pour.
Entrances, Right-of-Way and Local Rules
The City of Clarksville's driveway access ordinance sets driveway widths for uses other than single-family homes at 15 to 25 feet for one-way traffic and 25 to 35 feet for two-way[12], and keeps office, commercial and industrial driveways at least 10 feet from the property line[13]. The ordinance dates to 2006, so confirm it's current with the city before plans are final.
Building or changing a driveway on a state highway's right-of-way takes a TDOT highway entrance permit[14], and TDOT's standard driveway drawing caps commercial driveway apron grades at 8%, with 5% recommended[15]. In Nashville, right-of-way permits go through NDOT's ePermits system and must be requested at least 2 business days before work starts[16]. We handle permit pulls where the job requires them.
Licensing, Insurance and How We Bid
Tennessee requires a state contractor's license before contracting, including bidding or negotiating a price, on a project of $25,000 or more as a prime contractor[17]. In Bowling Green and Warren County, Kentucky, contractors need a license from the Bowling Green-Warren County Contractors Licensing Board[18]. Whoever you hire, us included, ask to see their license and proof of insurance before you accept a bid.
The Concrete Guys is licensed and insured in Tennessee, with general liability and workers' comp carried on every job. The finish crews are our own, not subcontractors.
Bids are line-item estimates delivered before the pour, and nothing gets added through a change order you didn't sign off on.
Phased Pours and Off-Hours Scheduling
Apartment sidewalks, storefronts and busy lots often can't close for a week. Multi-family and sidewalk pours can be phased and coordinated with property managers and general contractors, and pours can be scheduled off-hours or on weekends to keep disruption down.
Phases get planned around cure time. Our general guidance for new concrete, which is company guidance and not a code number: foot traffic after 24 to 48 hours, vehicles after 7 days, and curing continues for about 28 days. You get the cure time for your job, not just the pour date, so tenant notices and lane closures can be planned. You have one point of contact from estimate to final walkthrough.
NRMCA advises no deicing chemicals on new concrete in its first winter, clean sand for traction instead, and never ammonium- or magnesium-based deicers[19]. Pass that along to whoever clears your lot.
Light Commercial Flatwork Pricing
Ballpark: $9 to $13 per square foot for light commercial flatwork. That's a ballpark range; the number is confirmed at a free on-site visit. What moves it:
- Soil conditions, grading and base preparation
- Access for trucks and crews on an active site
- Removal and haul-off of existing concrete
- Rebar or fiber reinforcement, and slab thickness for the loads
Request a bid
Use the instant estimate for a ballpark number. Chris or Grant replies directly, within 1 business hour, with no call center in between. Building a new pad from the ground up? See foundations and slabs.
Sources
- Standard Drawing RP-D-15, Standard Concrete Driveways (rev. 04-10-2025) - Tennessee Department of Transportation. https://www.tn.gov/content/dam/tn/tdot/engineering-production-support/documents/standard-drawings/roadway-standard-drawings/current/roadway-and-pavement-appurtenances/intersections/RPD15.pdf
- CIP 6 - Joints in Concrete Slabs on Grade - National Ready Mixed Concrete Association (2014 rev.). https://www.nrmca.org/wp-content/uploads/2021/01/06pr.pdf
- CIP 6 - Joints in Concrete Slabs on Grade - National Ready Mixed Concrete Association. https://www.nrmca.org/wp-content/uploads/2021/01/06pr.pdf
- CIP 2 - Scaling Concrete Surfaces, Concrete in Practice series - National Ready Mixed Concrete Association (2014 rev.). https://www.nrmca.org/wp-content/uploads/2021/01/02pr.pdf
- U.S. Climate Normals 1991-2020, annual/seasonal - NOAA NCEI, station USC00401790 (Clarksville WWTP). https://www.ncei.noaa.gov/data/normals-annualseasonal/1991-2020/access/USC00401790.csv
- CIP 2 - Scaling Concrete Surfaces - National Ready Mixed Concrete Association. https://www.nrmca.org/wp-content/uploads/2021/01/02pr.pdf
- 2010 ADA Standards for Accessible Design - ADA.gov (U.S. Department of Justice). https://www.ada.gov/law-and-regs/design-standards/2010-stds/
- 2010 ADA Standards for Accessible Design - ADA.gov (U.S. Department of Justice). https://www.ada.gov/law-and-regs/design-standards/2010-stds/
- 2010 ADA Standards for Accessible Design - ADA.gov (U.S. Department of Justice). https://www.ada.gov/law-and-regs/design-standards/2010-stds/
- 2010 ADA Standards for Accessible Design - ADA.gov (U.S. Department of Justice). https://www.ada.gov/law-and-regs/design-standards/2010-stds/
- 2010 ADA Standards for Accessible Design - ADA.gov (U.S. Department of Justice). https://www.ada.gov/law-and-regs/design-standards/2010-stds/
- Ordinance 107-2005-06 (Driveway Access), City of Clarksville - Section VI(10) Driveways; width requirements. https://www.clarksvilletn.gov/DocumentCenter/View/292/Access-Management-Ordinance-PDF
- Ordinance 107-2005-06 (Driveway Access), City of Clarksville - Section VI(4). https://www.clarksvilletn.gov/DocumentCenter/View/292/Access-Management-Ordinance-PDF
- Manual for Constructing Driveway Entrances on State Highways, 2015 Edition - Tennessee Department of Transportation. https://www.tn.gov/content/dam/tn/tdot/traffic-engineering/2016_Driveway_Rules_Manual.pdf
- Standard Drawing RP-D-15, Standard Concrete Driveways (rev. 04-10-2025) - Tennessee Department of Transportation. https://www.tn.gov/content/dam/tn/tdot/engineering-production-support/documents/standard-drawings/roadway-standard-drawings/current/roadway-and-pavement-appurtenances/intersections/RPD15.pdf
- Nashville Department of Transportation Permits - Nashville.gov. https://www.nashville.gov/departments/transportation/permits
- Contractor (license requirements) - Tennessee Board for Licensing Contractors, TN Department of Commerce & Insurance. https://www.tn.gov/commerce/regboards/contractors/license/get/contractor.html
- Licensing Information & Applications - Contractors Licensing Board, City of Bowling Green, Kentucky. https://www.bgky.org/contractorslicensing/info
- CIP 2 - Scaling Concrete Surfaces - National Ready Mixed Concrete Association. https://www.nrmca.org/wp-content/uploads/2021/01/02pr.pdf
- 2010 ADA Standards for Accessible Design - ADA.gov (U.S. Department of Justice). https://www.ada.gov/law-and-regs/design-standards/2010-stds/
- Public Right-of-Way Accessibility Guidelines, R3: Technical Requirements - U.S. Access Board. https://www.access-board.gov/prowag/technical.html